<p><!-- BEGIN THEIA POST SLIDER --></p>
<!-- WP QUADS Content Ad Plugin v. 2.0.98.1 -->
<div class="quads-location quads-ad4" id="quads-ad4" style="float:none;margin:0px;">

</div>

<p>By Yusuf Danjuma Yunusa</p><div class="4dvl46xY" style="clear:both;float:left;width:100%;margin:0 0 20px 0;"><script async src="https://pagead2.googlesyndication.com/pagead/js/adsbygoogle.js"></script>

<!-- TV -->

<ins class="adsbygoogle"

 style="display:block"

 data-ad-client="ca-pub-4403533287178375"

 data-ad-slot="4399361195"

 data-ad-format="auto"

 data-full-width-responsive="true"></ins>

<script>

 (adsbygoogle = window.adsbygoogle || []).push({});

</script></div>
<p>Nigeria’s national power grid experienced a total collapse on Friday, January 23, 2026 the first such failure this year. Data from the Nigerian Independent System Operator (NISO) confirmed that power generation plunged to zero megawatts (MW) by 1:00 PM.</p><div class="rCOclppP" style="clear:both;float:left;width:100%;margin:0 0 20px 0;"><script async src="https://pagead2.googlesyndication.com/pagead/js/adsbygoogle.js"></script>

<!-- TV -->

<ins class="adsbygoogle"

 style="display:block"

 data-ad-client="ca-pub-4403533287178375"

 data-ad-slot="4399361195"

 data-ad-format="auto"

 data-full-width-responsive="true"></ins>

<script>

 (adsbygoogle = window.adsbygoogle || []).push({});

</script></div>
<p>As a result, load allocation to all 11 electricity distribution companies (DisCos) dropped to zero MW. Affected DisCos include: Abuja, Benin, Eko, Enugu, Ibadan, Ikeja, Jos, Kaduna, Kano, Port Harcourt, and Yola.</p>
<p>This incident follows a pattern of recurring grid instability throughout 2025, during which multiple system collapses were recorded—the last occurring on December 29. These repeated failures persist despite ongoing upgrades intended to enhance national grid capacity and reliability.</p>
<!-- WP QUADS Content Ad Plugin v. 2.0.98.1 -->
<div class="quads-location quads-ad1" id="quads-ad1" style="float:none;margin:0px;">

</div>

<p>The collapse comes shortly after the Niger Delta Power Holding Company (NDPHC) announced the restoration of an additional 450 MW to the grid. This followed scheduled maintenance on the Geregu National Integration Power Project (NIPP) plant, which was expected to boost overall supply.</p>
<!-- WP QUADS Content Ad Plugin v. 2.0.98.1 -->
<div class="quads-location quads-ad3" id="quads-ad3" style="float:none;margin:0px;">

</div>
<div class="RkV1jPyh" style="clear:both;float:left;width:100%;margin:0 0 20px 0;"><script async src="https://pagead2.googlesyndication.com/pagead/js/adsbygoogle.js"></script>

<ins class="adsbygoogle"

 style="display:block; text-align:center;"

 data-ad-layout="in-article"

 data-ad-format="fluid"

 data-ad-client="ca-pub-4403533287178375"

 data-ad-slot="6550225277"></ins>

<script>

 (adsbygoogle = window.adsbygoogle || []).push({});

</script></div>
<p>In related developments, NISO had partnered with the West African Power Pool Information and Coordination Centre (WAPP-ICC) in November 2025 to conduct synchronization tests between Nigeria’s grid and the wider West African power network a initiative aimed at improving regional energy security and resilience.</p>
<p>The latest collapse raises renewed concerns over the fragility of Nigeria’s electricity infrastructure and its impact on economic and daily activities.</p>
<p><!-- END THEIA POST SLIDER -->
<!-- WP QUADS Content Ad Plugin v. 2.0.98.1 -->
<div class="quads-location quads-ad4" id="quads-ad4" style="float:none;margin:0px;">

</div>
</p>
<script async src="https://pagead2.googlesyndication.com/pagead/js/adsbygoogle.js"></script>

<ins class="adsbygoogle"

 style="display:block"

 data-ad-format="autorelaxed"

 data-ad-client="ca-pub-4403533287178375"

 data-ad-slot="1004305389"></ins>

<script>

 (adsbygoogle = window.adsbygoogle || []).push({});

</script>
<!-- WP QUADS Content Ad Plugin v. 2.0.98.1 -->
<div class="quads-location quads-ad5" id="quads-ad5" style="float:none;margin:0px;">

</div>